FY23 Funding: $4,300,000
A 2014 Preliminary Engineering Report (PER) identified improvements to reduce street ponding depths and durations within the Sugar Creek area neighborhood, along Montclair Drive.
Upsizing of existing storm sewer pipes, outfall and inlets along with pavement replacement along the entire stretch of Montclair Drive from the outfall at the Centerpoint easement up to Country Club Blvd.